ALERTS

[RESOLVED] Âé¶¹´«Ã½Login Planned Production Failover Verification

Maintenance began at 8/9/2026 7:00 AM and ended at 8/9/2026 8:00 AM

Objective: Execute a planned production DR failover for the Âé¶¹´«Ã½Login service to verify services.

* User/System Impact: Existing batch jobs and connected services will continue to run. New login authentication attempts during the precise failover times may require a manual retry.

* Known criticality: Vetted and scheduled prior to the opening of Banner unclassified student registration on Monday, August 10.